3 Things You Need Before Installing a New Septic System

Spread the love

A new septic system is a large undertaking; months of planning often occur before the system can finally be installed. The land must be perc’d, inspected and permits must be obtained to begin the final process. Septic systems require the right distance from the home, soil that will allow for filtration and the pipes in place for waste transportation. There are many steps that must accomplished before the system can be completed. Here are three of the things you will need before your septic system can be installed.

  1. Layout. A layout plan is needed to prepare for your septic system installation. This is like a blueprint for a home, outlining the different components of the septic. The layout will show where the pipes, tank, drain field and distribution box will be located. Keep in mind the trees and landscaping that are in place that could interfere with your plumbing.
  2. Permits. You will need permits from your county or city for your septic system. Your septic system installation company can often help with this process. An inspection is usually required before permits will be issued.
  3. Tank size. Before you can install your system, you need to decide what size tank will be needed for your home. You want a tank that will be large enough for your current and future needs. Your septic professional can help you decide what size you need.

Of course, these three steps are just a few of the many factors that should be considered before installation. Having a professional septic company to help you navigate the preparation process will make sure that your installation goes smoothly and your system will last for many years to come.

Posted on behalf of:
Septic Service Pro, LLC
Peachtree Street NW
Atlanta, GA 30334
(678) 292-8728

Comments are closed.